All of the answers to your questions in one place

                        FAQs | Bricks and Pieces

                                                                  crossing the t’s and dotting the i’s

Frequently Asked Questions

Permitted Development Rights

A simple explanation about Permitted development rights
Permitted development rights are an automatic grant of planning permission which allow certain building works and changes of use to be carried out without having to make a planning application. Most houses have permitted development rights, but flats and maisonettes do not, so planning permission is required.
What is the process for permitted development?

If you are completely sure your project is permitted development you can start your building work. For proof that your building work is lawful you should apply for a lawful development certificate. If your project does not qualify as permitted development you will need to submit a planning application.

What can I build / do under permitted development?

Types of Permitted Development Rights

  1. Class A – Extensions (enlargement, improvement or alteration)
  2. Class B – Additions to the roof.
  3. Class C – Other alterations to the roof.
  4. Class D – Porches.
  5. Class E – Buildings etc. (outbuildings)
  6. Converting Commercial and Agricultural Buildings.
Do I need to inform the Council for permitted development?

The Planning Portal’s general advice is that you should contact your local planning authority and discuss your proposal before any work begins. They will be able to inform you of any reason why the development may not be permitted and if you need to apply for planning permission for all or part of the work.

What is the difference between permitted development and planning permission?

Works that require planning permission will require an application to be submitted, whereas those that fall within Permitted Development rights do not. … Permitted Development Rights technically require no decision time but the application for a “Certificate of Lawfulness”. We on your behalf will apply for a “Certificate of Lawfulness” to the local authority. The process is very similar to a Planning Application however there is no need for the local authority to consult your neighbours unlike a planning application. The application time scale is similar to applying for full planning permission 6 to 8 weeks and there is a fee payable to the local authority that we would advise you on.

Can Neighbour stop permitted development?

If there are no objections your extension can go ahead. If your adjoining neighbour raises an objection with the 21 day period then the local authority will make the final decision on whether your extension can go ahead.

Do I need an architect for permitted development?

Like planning permission, permitted development is regulated through your local planning authority. You should always speak to a qualified architect or designer to make sure your plans are compliant before you start building, and consider applying for a lawful development certificate.

Do I need building regs for a permitted development?

Planning permission and building regulations. An extension or addition to your house is considered to be permitted development, not requiring an application for planning permission, subject to set limits and conditions. … Most extensions of properties require approval under the Building Regulations.

Can permitted development be refused?

Keep in mind that there are lots of types of project that can be built under Permitted Development that would not be approved as a Planning App. … If you make a planning application and it does not meet the local planning guidance, then it will be refused even if the work is PD.

Can a council remove permitted development rights?

When planning permission was first granted to build your house, the council may have imposed a planning condition removing your permitted development rights, so that you will need planning permission even for very small extensions and minor alterations. … It is especially common on houses built since the 1970s.

What is the process for permitted development?

If you are completely sure your project is permitted development you can start your building work. For proof that your building work is lawful you should apply for a lawful development certificate. If your project does not qualify as permitted development you will need to submit a planning application.

Do I need to inform the Council for permitted development?

The Planning Portal’s general advice is that you should contact your local planning authority and discuss your proposal before any work begins. They will be able to inform you of any reason why the development may not be permitted and if you need to apply for planning permission for all or part of the work.

Can permitted development be refused?

Keep in mind that there are lots of types of project that can be built under Permitted Development that would not be approved as a Planning App. … If you make a planning application and it does not meet the local planning guidance, then it will be refused even if the work is PD.

When did permitted development rights come in?

The previous version of the legislation, the GPDO 1995, came into force on 3 June 1995, and was introduced by Statutory Instrument 1995 No. 418. During the time it was in force (i.e. from 3 June 1995 until 14 April 2015), the GPDO 1995 was amended by a number of subsequent statutory instruments.

Your Permitted Development rights

You can use PD rights as often as you like but your allowances for extension work can be used only once. If you are buying a property, it is your responsibility to find out what PD rights have been used, modified or withdrawn.

Can you appeal against permitted development?

If you have been refused a lawful development certificate by the local planning authority (LPA) then you can appeal that decision. … If the LPA refuses such an application for a lawful development certificate then you can appeal that decision, and the Planning Inspectorate will review your submission.

How long is permitted development process?

A planning application will take a maximum of 10 weeks to be decided, consisting of a 2-week validation period and an 8-week decision period. Permitted Development Rights technically require no decision time but the application for a COL can also take 10 weeks depending how busy your local authority is at the time of application.

Can a council remove permitted development rights?

When planning permission was first granted to build your house, the council may have imposed a planning condition removing your permitted development rights, so that you will need planning permission even for very small extensions and minor alterations. … It is especially common on houses built since the 1970s.

Is lawful development the same as permitted development?

It may, for instance, be possible to alter your plans to ensure they meet permitted development limits and conditions. For peace of mind you may choose to apply for a lawful development certificate (LDC). This is not the same as planning permission but is proof that your household building work is lawful.

Is permitted development allowed in conservation areas?

Permitted development rights do still exist in conservation areas, although they are reduced. However, in some cases, permitted development rights may be completely removed if there is an Article 4 direction associated with your conservation area.

How close to my boundary can I build an extension?

If you are planning on building an extension of more than one story you cannot go beyond the boundary at the rear by more than 3 meters. … With this, they take the closest window to your build on your neighbour’s property and if it breaches the ‘imaginary line’ then planning permission can be denied.

Are side dormers permitted development?

The dormer loft conversion includes a balcony, veranda or raised platform. … To fall within the conditions of permitted development, any side facing windows must be obscured glass, and only able to open at a height of 1.7 metres above the floor of loft room.

What is lawful development?

Definition of lawfulness and its limits

In summary, lawful development is development against which no enforcement action may be taken and where no enforcement notice is in force, or, for which planning permission is not required.

What is permitted development extension?

An extension or addition to your house is considered to be permitted development, not requiring an application for planning permission, provided certain limits and conditions are met. … No more than half the area of land around the “original house”* would be covered by additions or other buildings.

Are new windows permitted development?

You do not normally need planning permission to replace or add new windows in the original walls of your house. However, you may need planning permission if conditions were attached to the original permission. Double glazing can be installed under PD, providing the building is not listed.

How much does a certificate of lawful development cost?

Costs of a lawful development certificate

The cost of an application for a lawful development certificate is 50% of the cost of the corresponding planning application. For a householder project, the LDC would, therefore, be £118 as at April 2020 but these may vary, and it is advisable to check with your local authority

How can permitted development rights be removed?

When granting permission, conditions may be attached to the decision that limit or remove permitted development rights. This applies to the individual property, and may restrict further extensions or alterations. … ‘ It removes the right to any permitted development on any of the land referred to within it.

What is Article 4 Planning restriction?

An article 4 direction is made by the local planning authority. It restricts the scope of permitted development rights either in relation to a particular area or site, or a particular type of development anywhere in the authority’s area.

Is there a time limit on permitted development?

Is there a time limit on permitted development? Usually no, but in May 2013 a range of permitted development rights were brought into force which are time limited. So for example, the permitted development right that allows change of office use to residential use, applies between 30 May 2013 and 30 May 2016.

What is the 4 year rule?

The ‘4 Year Rule‘ allows you to make a formal application for a certificate to determine whether your unauthorised use or development can become lawful through the passage of time — not through compliance with space standards — and can be continued without the need for planning permission.

Can a lawful development certificate be revoked?

Possible revocation of a certificate

If a false statement is made or document used, or any material information is withheld, the planning authority can revoke a Lawful Development Certificate. … But the decision may be contested in the High Court on the ground that the authority acted unreasonably in making the decision.

Are Juliet balconies permitted development?

In most cases Juliet balconies are considered Permitted Developments. As such, they shouldn’t need planning permission but there are a few exceptions: The Juliet balcony has a floor, no matter how slim, it will be considered a raised platform and will need planning approval.

YOUR PERMITTED DEVELOPMENT RIGHTS

These are a national grant of Planning Permission which allow certain building works and changes of use to be carried out without having to make a Planning Application. They are subject to conditions and limitations in order to control impacts and to protect the local amenities.

In layman’s terms: you can do certain alteration to your property under your Permitted Development Rights.
Most homeowners can usually use their Permitted Development Rights and apply for a Certificate of Lawfulness instead of submitting a Planning Application.

Applying for a Certificate of Lawfulness and exercising your Permitted Development Rights is similar to submitting a householders Planning Application, but your neighbours are not consulted and do not need to give their approval. Often you can build a larger single story rear extension, subject to certain criteria. Bricks and Pieces will be happy to explain Your Permitted Development Rights, the options for your proposed build and the best way to procced.

Either: Permitted Development route or the house holders Planning Application route.

Another advantage of building using Your Permitted Development Rights, is that the local authorities application fee is usually 50% of their normal Planning Application fee (currently averaging £126 – Oct 2020) 

Planning Permission

What is exempt from planning permission?

Exempted development is development for which planning permission is not required. Categories of exempted development are set out in the Planning and Development Regulations 2001-2010. They usually refer to developments of a minor nature, such as small extensions to houses, garden walls and so on.

Can you start work without planning permission?

As tempting as it is to finally get the contractors started and begin building without planning permission, there are risks and you may be subjected to a planning breach. … However, anything that requires the creation of a new house, or extensive changes to an existing building will usually require planning permission.

Why do we need planning permission?

Planning permission is the consent of your local authority on a proposed building project and is in place to deter inappropriate development. The building of a new dwelling, or extensive changes to existing buildings, usually requires planning permission.

Can a Neighbour appeal against a planning decision?

After the decision

In England, it is not possible for a third party to appeal against a local planning authority’s decision. For example, if your neighbour was granted permission to build an extension you could not appeal against it, even if you objected to the application at an earlier stage of the process.

How do you protest against planning permission?

What is a valid objection to a planning application

  1. Loss of light or overshadowing.
  2. Overlooking/loss of privacy.
  3. Visual amenity (but not loss of private view).
  4. Adequacy of parking/loading/turning.
  5. Highway safety.
  6. Traffic generation.
  7. Noise and disturbance resulting from use.
  8. Hazardous materials.
How many objections do you need to stop planning permission?

However, generally speaking 5 – 10 good objections are often enough to get an application ‘called in’ to a committee meeting for councillors to decide (although this does differ between local authorities). Otherwise a case officer (with management supervision) may make a decision under ‘delegated powers’.

How does the planning process work?

Planning control is the process of managing the development of land and buildings. … Your local planning authority is responsible for deciding whether a development, anything from an extension on a house to a new shopping centre, should go ahead.

What is a delegated decision in planning?

Delegated powers for planning decisions. In relation to planning permission, delegated powers are used by Local Planning Authorities (LPA) to deal with planning applications. Delegated powers enable planning officers to determine applications themselves without needing a decision from the planning committee.

Do you need planning permission for a non permanent structure?

Temporary Buildings Planning Permission and Regulations. You could be forgiven for assuming because a building is temporaryplanning permission is not a requirement. Indeed, there are a couple of instances when planning permission may not be a requirement, but in most cases, planning permission is a requirement.

Do you need planning permission for Gates?

Planning PermissionYou will need to apply for planning permission if you wish to erect or add to a fence, wall or gate: if it would be over one metre high and next to a highway used by vehicles (or the footpath of such a highway); or over two metres high elsewhere;

How can permitted development rights be removed?

When granting permission, conditions may be attached to the decision that limit or remove permitted development rights. This applies to the individual property, and may restrict further extensions or alterations. … ‘ It removes the right to any permitted development on any of the land referred to within it.

What happens if planning conditions are not met?

Your local planning authority can serve an enforcement notice on you when they consider you have broken planning control rules. … You can appeal against both refusals of permission and enforcement notices but if the verdict comes out against you and you still refuse to comply you may be prosecuted.

Can Council make you pull down a structure?

Council has the authority to make you pull down your building if it is found to have been illegally built. If you‘re wondering how they would ever possibly find out, councils have been known to use satellite imagery to make sure people don’t have illegal structures on their property!

Can you install uPVC windows in a conservation area?

If you want to fit uPVC windows in a conservation area, then it is important to ensure that the design of the new windows does not differ considerably from the originals. Fortunately, it is now possible to achieve the look and charm of timber windows with a modern uPVC substitute.

Can my Neighbour build right to my boundary?

In general, your neighbour only has the right to build up to the boundary line (line of junction) between the two properties but there are circumstances when they can legitimately build on your land. You can give consent for them to build a new party wall and foundations on your land.

What is the 45 degree rule in planning?

The 45degree rule is assessed on both plan and elevation. An extension should not exceed a line taken at 45 degrees from the centre of the nearest ground floor window of a habitable room in an adjoining property

What does minded to refuse mean?

You must provide a ‘Minded to Refuse notification’, which means simply that you must tell the applicant you are thinking of refusing the application based on false representation, set out exactly what the allegation is and make it clear that you are alleging dishonesty.

Can my Neighbour object to my extension?

A terraced house and semi-detached house can be extended up to 6 metres and a detached house up to 8 metres from the original house. However, your neighbours do have the right to object to this. They have a 21 day period in which they can give valid reasons as to why they believe the extension should not be built.

Are planning objections anonymous?

Regarding a residential planning application, is there any requirement for the local council to make available copies of representations (objections) in full including names and addresses, or is it legal for them to provide copies with names and addresses blanked out, thereby frustratingly rendering the objections 

Larger Home Extension Scheme/Neighbour Consultation Scheme

Larger Home Extension Scheme OFTEN REFERED TO AS THE NEIGHBOUR CONSULTATION SCHEME

This scheme allows you to build certain extensions (like a single storey rear extension), as the name suggests, to a size increase of up to 50% more than what is allowed when you use your Permitted Development Rights.

Yes, that’s right, you can build 50% larger buildings than if you were to use your Permitted Development Rights.

The government originally gave a time limit on the scheme, which was due to run out at the end of May 2019, but we are pleased to inform you it has now been made permanent.

The Neighbour Consultation Scheme is, as it suggests, a scheme where your neighbours will be consulted about your proposed build. The Neighbour Consultation Scheme, also known as Prior Notification Application, requires a prior application to the local authority. Your neighbours are then given a 21 day period where they have the right to object, with valid reasoning as why, to the proposed extension being built. After this period the local authority have a further 21 days to issue the go ahead for the proposed build.

There is no fee for a Prior Notification Application. However, once the statutory 42 day period is over, a fee will be payable for a Certificate of Lawfulness to be issued. It usually takes around 8 weeks to receive th

Building Regulations & Inspections

Why do you need professionally prepared technical building regulation drawings?

HOW CAN THEY COULD SAVE YOU £1000’S WHEN IMPROVING YOUR HOME?

Some plan drawers produce very poor-quality building regulation drawings, and many homeowners are unaware of the difference between the two sets of drawings. You can always identify a professional builder as if you give them a poor standard set of building regulation drawings they will tell you they are not fit for purpose and tell you to get a proper set drawn up and then they will price for your project. However, a less scrupulous builder will price the works often at a low price to win the contract. Only to then once the contracts have been signed and the builder has started on site will use these drawings against you.

He will tell you time and time again that what you thought was included in his price is not. They will tell you time and time again that this or that was not shown on your poorly prepared building regulation drawing and the item is an extra.

This then becomes the norm, and you will soon be paying £1000’s more in builders extras.

Our advice is saved yourself a lot of time stress and money and always have professional technical building regulation drawings prepared as it will save you a lot of time, stress, and money.

Do you have to use the local authority building control or can you use an approved independent building inspector?

Due to the demand in the building industry, in the recent years Approved Building Inspectors have been introduced into the market place. They independently take on the role of and the duties previously carried out by the Local Authorities Building Control Department.

Upon request Bricks and Pieces will go out to Approved Building Inspectors for comparable quotes on your behalf.

It is then up to you who you wish to use – Local Authority or Approved Building Inspector.

For the Building Regulations to be approved by either the Local Authority or the Approved Building Inspector it usually takes around 3-5 weeks.

BRICKS AND PIECES WARNING!

You should NEVER start building work on your property before your Building Regulation Drawings have been approved.

If you do commence building without approval, this is at your own risk. The Building Inspector may ask for modifications to be made to the drawings, so always give yourself enough time to have the drawing approved BEFORE allowing the buildings to start on site.

when does the building inspector visit the site to inspect the works?

1 – After the excavation of the foundations.

2 – Once the brick work reaches damp-proof level
(usually 150mm above finished floor level).

3 – Once the floor is prepared; prior to the concrete floor being
poured (assuming concrete floor).

4 – Once the brickwork reaches the roof plate (the roof height).

5 – At pre-plaster stage; this is to ensure the inspector can sign off
the works prior to plaster boarding and plastering.

6 – Upon final completion of the works.

what fees may you need to pay to others?

1 – Structural engineers calculations if required

3 – Thermal calculations if required

4 – Party wall act surveyor if required

 

General

Our Initial Advice When Improving Your Property

Think about how the proposed build will affect the neighbouring properties!

During the planning approval process the neighbouring properties will be consulted.

Many of our clients share our 3D visualisations with their neighbours to show them the proposed build,
before we have even submitted the planning application on their behalf.

It is better to discuss all aspects of your proposed build with your neighbours as by getting them on board with your proposed build at this early stage, could help avoid any surprise objections further down the line. 

is your property Freehold?

This is when you own the building, and the land its built on, outright. Basically you’re responsible for maintaining the property and land.

Most houses are freehold but some might be leasehold – usually through shared-ownership schemes.

is your property Leasehold?

This is where you own the property until the lease agreement period* has expired. When the lease ends, ownership returns to the freeholder, unless they allow you to extend or purchase the lease.

If your property is leasehold, and the lease is current, you will need to obtain the permission of the leasehold owner in order to legally carry out any building works**.

typical factors that can effect a planning application

– If it is in a Conservation Area

– The Neighbouring Properties

– If it is a Listed Building

– If there are any Tree Preservation Orders (TPO) in place

– Where the highway is situated & the proposed access to the highway

– If it is Situated in a Flood Plain

– If there are Protected Species in the area

To ensure the success of your planning application, Bricks and Pieces have to take all of these factors into consideration.

If you are aware of any issues that you feel we should know about, to assist with your application, it’s always worth pointing these out and discussing them with us at this early stage.

How Long Does Planning Approval Take?

Planning Applications normally take around 6-8 weeks* to complete.

Here at Bricks and Pieces we have a 96% approval rate. If your Planning Application falls into the other 4%, and the application is declined, we would advise you on the appeal process available.

*However in the current climate and due to the pandemic, we are finding applications are taking around 8-10 weeks.

What's the difference between - Planning Drawings and Building Regulation Drawings?

Planning Drawings are to help you obtain Permission Approval for the proposed build.

Building Regulation Drawings are to help you to obtain Building Regulation Approval.

Remember: Builders will use the Building Regulation Drawings to help work out a price for your project. The more detailed and accurate your building regulation drawings are, the more accurately priced the builders price will be. Builders ALWAYS blame poor drawings and often try to claim missed items from the drawings as extras. The professional quality prepared drawings that we produce will save you money in the long run.